Video YouTube
2,728 views Published 17 Dec 2014 Open on YouTube 👍 Log in to like

GWML Video 2 Before it gets "ELECTRIFIED" filmed 4/12/14

Channel: antman09ful1
Player
Description
This second video on the GWML now covers a short distance from Goring to Moreton Cutting area, and you will see that the metal posts for the overhead gantrys are going up in places. Hope you find it interesting were I filmed freight and HSTs working the line.
AI summary Generated from Fishplate metadata

This video captures footage along the Great Western Main Line between Goring and Moreton Cutting, showing the installation of overhead gantry posts as part of electrification works. Trains including freight services and HSTs are visible operating on the line. The recording includes several locomotives from classes 165, 185, and 66, with operators such as DB Schenker, EWS, First Great Western, and Freightliner identified. Locations featured include Cholsey, Hope, and Moreton.

This summary is generated from structured Fishplate data and may need human review.
Unlock the full video breakdown

Fishplate has identified 10 locomotives in this video. We’ve also matched 4 operators . Create a free account to see where they appear, unlock timestamps and locations, and view the full breakdown.

History
Details
  • Platform ID u1Ld116ggRM
  • Views 2,728
  • Date published 17 Dec 2014 21:22
  • Date added 25 Jan 2026 00:47
  • Recorded 4 Dec 2014
  • Locomotives 10
  • Headcodes 0
Quick links
Log in to open the linked headcodes, operators, and vehicles detected for this video.
Location
Log in to view filming locations, route context, and the map for this video.
Recording date
Log in to view and help verify the recording date for this upload.
Thumbnails YouTube
Tip: right-click the player for stats, or open on YouTube for comments.