Cambridge South Station Is Under Construction
[ I suspect this will be station number 2,590 on the network when it opens in early 2026 ]
Network Rail page: https://www.networkrail.co.uk/running-the-railway/our-routes/anglia/improving-the-railway-in-anglia/cambridge-south-station/
I've also filmed a bonus video where I ride the Cambridge Guided Busway which will be available to members only.
You can join Memberships on this channel here:
https://www.youtube.com/channel/UCd18OhMfRmjMjzSHP7Zrzmw/join
CORRECTIONS
3:56 The map that show the speeds is the wrong way round. The inside tracks that stop at the island platform have a speed limit of 90mph, and the outside loop tracks have a speed limit of 60mph
This video provides an overview of the ongoing construction at Cambridge South Station, which is expected to open in early 2026. The footage captures the progress of the new station, with mentions of related infrastructure such as the Cambridge Guided Busway. The video also references Network Rail and Colas as involved operators, and highlights several locations including Cambridge, Cambridge North, Foxton, Newmarket, Royston, Shelford, Shepreth, and Whittlesford Parkway. Some details about speed limits on nearby tracks are noted in the corrections section.
Fishplate has identified 0 locomotives in this video. We’ve also matched 2 operators . Create a free account to see where they appear, unlock timestamps and locations, and view the full breakdown.
- pY1v8dcqJOU
- 92,958
- 12 Mar 2025 16:59
- 2 Jan 2026 15:38
- 0
- 0