Video YouTube
10,481 views Published 11 Apr 2019 Open on YouTube 👍 Log in to like

"The Day BATH SPA Station Had Big Problems"

Channel: antman09ful1
Player
Description
In this video you will see the problems they had at Bath Spa station when there was major signalling problems on Saturday 23rd March 2019
AI summary Generated from Fishplate metadata

The footage includes trains from various operators, including Cross Country, First Great Western, and GWR, as well as locomotives and rolling stock identified by their classifications. The incident is shown against the backdrop of Bath Spa and Oldfield Park. While specific headcodes are not listed in the metadata, the video provides insight into the challenges faced during this disruption.

This summary is generated from structured Fishplate data and may need human review.
Unlock the full video breakdown

Fishplate has identified 6 locomotives in this video. We’ve also matched 3 operators . Create a free account to see where they appear, unlock timestamps and locations, and view the full breakdown.

History
Details
  • Platform ID 15cZyDLOxpA
  • Views 10,481
  • Date published 11 Apr 2019 16:13
  • Date added 3 Feb 2026 18:19
  • Recorded 23 Mar 2019
  • Locomotives 6
  • Headcodes 0
Quick links
Log in to open the linked headcodes, operators, and vehicles detected for this video.
Location
Log in to view filming locations, route context, and the map for this video.
Recording date
Log in to view and help verify the recording date for this upload.
Thumbnails YouTube
Tip: right-click the player for stats, or open on YouTube for comments.