Werrington Junction Upgrade 11th July 2021
Link to Trackside ECML's video of track laying at Lincoln Road two weeks previously. https://www.youtube.com/watch?v=EezlYAQU280
Network Rail Werrington Grade Separation
https://www.networkrail.co.uk/running-the-railway/our-routes/east-coast/east-coast-upgrade/werrington-grade-separation/
LumenRT Real Time WGS animation
https://www.youtube.com/watch?v=Jdv-H-ahGLc&t=7s
Werrington Grade Separation animation
https://www.youtube.com/watch?v=15IsBt7In0U&feature=youtu.be
articles, photos, plans and more.
https://drive.google.com/drive/folders/1-A1162n04x6xDXVyuQbf-am4O8ps52qy?usp=sharing
#werrington #peterborough
This video shows the second phase of track laying on the new route through the dive under at Werrington Junction. The work focuses on installing the Up Line from just after the A15 road bridge, through the dive under to Marholm Junction. Progress includes laying sleepers and track during the night and continuing early Sunday morning. The project is part of the Werrington Grade Separation upgrade managed by Network Rail. Other locations mentioned include Glinton Junction, Lincoln, Peterborough, and Stamford.
Fishplate has identified 1 locomotive in this video. We’ve also matched 3 operators . Create a free account to see where they appear, unlock timestamps and locations, and view the full breakdown.
- EdaTPSZsn6U
- 9,334
- 12 Jul 2021 13:15
- 11 Jul 2026 08:04
- 11 Jul 2021
- 1
- 0