Video YouTube
115 views Published 7 Oct 2025 Open on YouTube 👍 Log in to like

‘New’ Vectrons on the GKB Network - 19/9/25

Channel: HSTHoward
Player
Description
On the 19th of September 2025 I returned to Graz to view the “New” Vectrons operating for GKB. Throughout July the line to Wies Einiswald was closed for electrification, and to cover the shortage of ETCS fitted units, Top & Tail Vectrons have been deployed on ex DB Dosto stock. In operation this day was, 193 601, 193 602, 193 604, 193 801, 193 864 & 193 867.

Enjoy!
AI summary Generated from Fishplate metadata

A video captures the operation of Vectrons on the GKB Network in September 2025. The footage shows several units, including 193 601, 193 602, 193 604, 193 801, 193 864, and 193 867, which were deployed to cover a shortage of ETCS-equipped trains following electrification works on the line to Wies Einiswald. The operator involved is DB Schenker. Some details such as specific locations and additional stock information are not included in the current record.

This summary is generated from structured Fishplate data and may need human review.
Unlock the full video breakdown

Fishplate has identified 0 locomotives in this video. We’ve also matched 1 operator . Create a free account to see where they appear, unlock timestamps and locations, and view the full breakdown.

History
Details
  • Platform ID WbzHD1rEvzI
  • Views 115
  • Date published 7 Oct 2025 10:24
  • Date added 8 Feb 2026 03:19
  • Recorded 19 Sep 2025
  • Locomotives 0
  • Headcodes 0
Quick links
Log in to open the linked headcodes, operators, and vehicles detected for this video.
Location
Log in to view filming locations, route context, and the map for this video.
Recording date
Log in to view and help verify the recording date for this upload.
Thumbnails YouTube
Tip: right-click the player for stats, or open on YouTube for comments.