post-Christmas class 60 start up at Peak Forest
A video shows two Class 60 diesel locomotives, 60015 and 60079, undergoing start-up procedures at Peak Forest on a cold night in late December 2013. The footage captures 60015 operating after being started up, while 60079 is also in the process of starting. The event took place following a period of inactivity lasting approximately five to six days. No additional details about operators, locations, or headcodes are available in the metadata.
Fishplate has identified 2 locomotives in this video. Create a free account to see where they appear, unlock timestamps and locations, and view the full breakdown.
- bspKtR0Tay4
- 1,924
- 11 Jan 2014 01:22
- 13 Feb 2026 12:42
- 29 Dec 2013
- 2
- 0