GBRf 66702 brings the First Train into East Peckham Tip for 8 years! 26/11/25
Due to the small size of the terminal, the train had to be split into two. The points also failed, and had to be manually operated to get the train in which caused around 45 minutes of delay.
Enjoy! Let’s hope it becomes a regular flow in the future.
A train operated by GBRF, hauled by locomotive 66702, arrived at East Peckham Tip after an eight-year absence on 26 November 2025. The train originated from Drax Power Station and carried flyash for tarmac production. It passed through Five Oak Green and Beltring before reaching the terminal, where it had to be split due to space constraints. Points failure caused a 45-minute delay as manual operation was required. No headcodes were recorded in the metadata.
Fishplate has identified 2 locomotives in this video. We’ve also matched 3 operators . Create a free account to see where they appear, unlock timestamps and locations, and view the full breakdown.
- CsBxMxWxn6M
- 132
- 8 Dec 2025 20:33
- 26 Mar 2026 09:48
- 26 Nov 2025
- 2
- 0