Video YouTube
2,999 views Published 27 Oct 2020 Open on YouTube 👍 Log in to like

Bristol East Jct Track Renewal Works 24-10-20

Channel: swearingkevo
Player
Description
Bristol East Jct Track Renewal Works on the 24th October 2020..
Replacing the Rails and Points outside Bristol Barton Hill Depot
AI summary Generated from Fishplate metadata

This video shows track renewal works taking place at Bristol East Jct on 24 October 2020. The footage captures the replacement of rails and points outside Barton Hill Depot. Freightliner is identified as the operator involved in the work. Other locations mentioned include Pant. Two locomotives, numbered 66533 and 66957, are present in the video. No headcodes were detected in the metadata.

This summary is generated from structured Fishplate data and may need human review.
Unlock the full video breakdown

Fishplate has identified 2 locomotives in this video. We’ve also matched 1 operator . Create a free account to see where they appear, unlock timestamps and locations, and view the full breakdown.

History
Details
  • Platform ID 50jBUI8ciMs
  • Views 2,999
  • Date published 27 Oct 2020 16:55
  • Date added 6 Apr 2026 06:43
  • Recorded 24 Oct 2020
  • Locomotives 2
  • Headcodes 0
Quick links
Log in to open the linked headcodes, operators, and vehicles detected for this video.
Location
Log in to view filming locations, route context, and the map for this video.
Recording date
Log in to view and help verify the recording date for this upload.
Thumbnails YouTube
Tip: right-click the player for stats, or open on YouTube for comments.