**TAXI** Network Rail Engineers Get Taxi Into The Severn Tunnel For Track Maintanance Work 05-07-24
Tunnel is Closed For 2 Weeks For Track Renewal
Network Rail engineers conducted track maintenance work inside the Severn Tunnel on 5 July 2024. The tunnel was closed for two weeks to allow for essential track renewal. The video shows engineers using a taxi to access and exit the tunnel as part of the maintenance operations. No additional operational details or specific locations are provided in the metadata.
Fishplate has identified 0 locomotives in this video. We’ve also matched 1 operator . Create a free account to see where they appear, unlock timestamps and locations, and view the full breakdown.
- Rs_4UkA5nJ0
- 592
- 8 Jul 2024 13:38
- 6 Apr 2026 18:02
- 5 Jul 2024
- 0
- 0