Video YouTube
3,048 views Published 10 May 2012 Open on YouTube 👍 Log in to like

44871/45407 make history as 1st steam from mainline in 40 yrs

Channel: Mike Wilcock. Rails in Wales.
Player
Description
On May 7th 2012 the 2 black fives from the Heart of Wales railtour made history as they arrived for a 5 days stabling at the Barry Tourist Railway deport adjacent to Barry station. Nick and I were invited by John Buxton to record the scene for posterity. In heavy rain and strong winds we battled with the elements and bring you a short video of the scene both outside and inside the shed. The last time steam came to Barry directly by rail was in the 1960s
AI summary Generated from Fishplate metadata

A video captures the arrival of two steam locomotives at Barry station in 2012, marking a historic event as the first mainline steam operation in over four decades. The footage shows the locomotives being stabled at the Barry Tourist Railway depot following a railtour. The scene was recorded under challenging weather conditions and includes both exterior and interior views of the depot. The last time steam arrived at Barry by rail was in the 1960s.

This summary is generated from structured Fishplate data and may need human review.
Unlock the full video breakdown

Fishplate has identified 0 locomotives in this video. We’ve also matched 2 operators . Create a free account to see where they appear, unlock timestamps and locations, and view the full breakdown.

History
Details
  • Platform ID GPOSwch3ZRw
  • Views 3,048
  • Date published 10 May 2012 00:30
  • Date added 20 Jun 2026 15:48
  • Locomotives 0
  • Headcodes 0
Quick links
Log in to open the linked headcodes, operators, and vehicles detected for this video.
Location
Log in to view filming locations, route context, and the map for this video.
Recording date
Log in to view and help verify the recording date for this upload.
Thumbnails YouTube
Tip: right-click the player for stats, or open on YouTube for comments.