Werrington Junction Upgrade 15th June 2020
Excavating the ramp towards the dive-under and freight trains causing congestion on the main line.
Network Rail Werrington Grade Separation
https://www.networkrail.co.uk/running-the-railway/our-routes/east-coast/east-coast-upgrade/werrington-grade-separation/
LumenRT Real Time WGS animation
https://www.youtube.com/watch?v=Jdv-H-ahGLc&t=7s
Werrington Grade Separation animation
https://www.youtube.com/watch?v=15IsBt7In0U&feature=youtu.be
articles, photos, plans and more.
https://drive.google.com/drive/folders/1-A1162n04x6xDXVyuQbf-am4O8ps52qy?usp=sharing
#werrington #peterborough
This video shows construction activity at Werrington Junction, focusing on the upgrade of the grade separation. It includes footage of sheet piling work under a footbridge using smaller machinery due to height restrictions and excavation of a ramp towards the dive-under structure. Freight trains are noted as causing congestion on the main line. The project is part of Network Rail's East Coast Upgrade. No train headcodes are identified in the metadata.
Fishplate has identified 3 locomotives in this video. We’ve also matched 6 operators . Create a free account to see where they appear, unlock timestamps and locations, and view the full breakdown.
- o8z_lHnDi38
- 2,332
- 16 Jun 2020 16:10
- 2 Jul 2026 19:31
- 15 Jun 2020
- 3
- 0