Werrington Junction Upgrade Mid July 2021
Network Rail Werrington Grade Separation
https://www.networkrail.co.uk/running-the-railway/our-routes/east-coast/east-coast-upgrade/werrington-grade-separation/
LumenRT Real Time WGS animation
https://www.youtube.com/watch?v=Jdv-H-ahGLc&t=7s
Werrington Grade Separation animation
https://www.youtube.com/watch?v=15IsBt7In0U&feature=youtu.be
articles, photos, plans and more.
https://drive.google.com/drive/folders/1-A1162n04x6xDXVyuQbf-am4O8ps52qy?usp=sharing
#werrington #peterborough
This video provides an update on the Werrington Junction upgrade project in mid-2021. Track has been laid between Glinton Junction and Marholm Junction, with ballasting and tamping now required. New signals have been installed, and construction efforts focus on removing spoil and replacing hardcore with topsoil at hardstanding areas. The work is part of the Network Rail Werrington Grade Separation project. Additional information and resources are available through the provided links.
Fishplate has identified 0 locomotives in this video. We’ve also matched 1 operator . Create a free account to see where they appear, unlock timestamps and locations, and view the full breakdown.
- dE-pKZ77MdA
- 5,161
- 24 Jul 2021 12:53
- 2 Jul 2026 21:31
- 8 Jul 2021
- 0
- 0