Werrington Junction Upgrade April 2021

Channel: werrington junction
Player
Description
It has been quite awhile since my last video update mainly due to Covid lockdown restrictions, cold weather and the majority of work being done underground since the installation of the box jack. Other work such as the rough placing of sleepers and track for the Up Stamford line have been done overnight. So there has been little to report on a daily basis. The site is gradually being wound down with some offices being removed, fencing going up and general tidying up, spoil is being removed in vast quantities each day with a never ending stream of lorries. The main work now will be centred around Hurn Road to complete the northern ramp trackbed into the tunnel, the creation of Marholm Junction at Walton and slewing the Up Stamford line at Hurn Road, then track laying from Glinton Junction through the tunnel to Marholm Junction. Some dates of these works are in the newsletter at the end of the video.

Network Rail Werrington Grade Separation
https://www.networkrail.co.uk/running-the-railway/our-routes/east-coast/east-coast-upgrade/werrington-grade-separation/

LumenRT Real Time WGS animation
https://www.youtube.com/watch?v=Jdv-H-ahGLc&t=7s

Werrington Grade Separation animation
https://www.youtube.com/watch?v=15IsBt7In0U&feature=youtu.be

articles, photos, plans and more.
https://drive.google.com/drive/folders/1-A1162n04x6xDXVyuQbf-am4O8ps52qy?usp=sharing


#werrington #peterborough
AI summary Generated from Fishplate metadata

This video provides an update on the Werrington Junction upgrade project, detailing ongoing construction activities and progress. The site is being gradually wound down with offices removed, fencing installed, and spoil cleared daily. Key tasks include completing the northern ramp trackbed into the tunnel, creating Marholm Junction at Walton, slewing the Up Stamford line at Hurn Road, and laying tracks from Glinton Junction through the tunnel to Marholm Junction. The work involves multiple railway operators and spans several locations along the East Coast Main Line. Some project dates are mentioned in the video's newsletter.

This summary is generated from structured Fishplate data and may need human review.
Unlock the full video breakdown

Fishplate has identified 0 locomotives in this video. We’ve also matched 6 operators . Create a free account to see where they appear, unlock timestamps and locations, and view the full breakdown.

History
Details
  • Platform ID I7GHb91jJZg
  • Views 5,824
  • Date published 27 Apr 2021 12:38
  • Date added 2 Jul 2026 22:16
  • Recorded 24 Jan 2021
  • Locomotives 0
  • Headcodes 0
Quick links
Log in to open the linked headcodes, operators, and vehicles detected for this video.
Location
Log in to view filming locations, route context, and the map for this video.
Recording date
Log in to view and help verify the recording date for this upload.
Thumbnails YouTube
Tip: right-click the player for stats, or open on YouTube for comments.