Piling at Lincoln Road
After two months of enforced lockdown it was nice to get out to capture some of the ongoing progress of the junction upgrade.
Much of the piling so far has been done around the actual dive-under and the wide-way to the south, all of which has been out of reach to the public. Here at Lincoln Road, closer to public viewing, we have a close up of the actual sequence of events that go into creating a concrete pile.
Many thanks to those working on site for answering inquisitive questions.
Network Rail Werrington Grade Separation
https://www.networkrail.co.uk/running-the-railway/our-routes/east-coast/east-coast-upgrade/werrington-grade-separation/
LumenRT Real Time WGS animation
https://www.youtube.com/watch?v=Jdv-H-ahGLc&t=7s
Werrington Grade Separation animation
https://www.youtube.com/watch?v=15IsBt7In0U&feature=youtu.be
articles, photos, plans and more.
https://drive.google.com/drive/folders/1-A1162n04x6xDXVyuQbf-am4O8ps52qy?usp=sharing
#werrington #peterborough
The footage shows the process of creating concrete piles as part of the infrastructure development. The project involves Network Rail and Romic, with activity taking place in Lincoln, Peterborough, and Werrington Junction. The video provides a close-up view of construction activities that are typically not accessible to the public. Information about the project is also shared through linked resources.