Werrington Junction Upgrade 16th August 2020
Network Rail Werrington Grade Separation
https://www.networkrail.co.uk/running-the-railway/our-routes/east-coast/east-coast-upgrade/werrington-grade-separation/
LumenRT Real Time WGS animation
https://www.youtube.com/watch?v=Jdv-H-ahGLc&t=7s
Werrington Grade Separation animation
https://www.youtube.com/watch?v=15IsBt7In0U&feature=youtu.be
articles, photos, plans and more.
https://drive.google.com/drive/folders/1-A1162n04x6xDXVyuQbf-am4O8ps52qy?usp=sharing
#werrington #peterborough
This video shows the tidying up process following overnight track laying during a possession at Werrington Junction on 16 August 2020. It focuses on the installation of part of the new Glinton Junction as part of the Joint Line upgrade. The footage captures work in progress, with limited close-up views due to restricted public access points. Network Rail and other operators are involved in the project, which is part of the East Coast Upgrade. Locomotives identified include classes 66 and 92, and headcodes such as 1L99, 3L99, and 4L99 are present.
Fishplate has identified 3 locomotives in this video. We’ve also matched 3 headcodes and 3 operators . Create a free account to see where they appear, unlock timestamps and locations, and view the full breakdown.
- I4pal2IOasA
- 1,421
- 16 Aug 2020 23:54
- 3 Jul 2026 23:02
- 16 Aug 2020
- 3
- 3