Werrington Junction Upgrade 19th November 2020
Network Rail Werrington Grade Separation
https://www.networkrail.co.uk/running-the-railway/our-routes/east-coast/east-coast-upgrade/werrington-grade-separation/
LumenRT Real Time WGS animation
https://www.youtube.com/watch?v=Jdv-H-ahGLc&t=7s
Werrington Grade Separation animation
https://www.youtube.com/watch?v=15IsBt7In0U&feature=youtu.be
articles, photos, plans and more.
https://drive.google.com/drive/folders/1-A1162n04x6xDXVyuQbf-am4O8ps52qy?usp=sharing
#werrington #peterborough
This video shows the early stages of trackbed construction at Werrington Junction, with ballasted track being laid north of Cock Lane footbridge towards Marholm Junction. The footage includes views of spoil removal and access tunnels near Stamford Lines. Network Rail and Freightliner are mentioned as involved in the project. Key locations include Werrington Junction, Marholm Junction, Walton, Stamford, and Peterborough. No train headcodes are present in the metadata.
Fishplate has identified 1 locomotive in this video. We’ve also matched 2 operators . Create a free account to see where they appear, unlock timestamps and locations, and view the full breakdown.
- dJZsMH5fgMU
- 1,754
- 19 Nov 2020 18:34
- 4 Jul 2026 21:47
- 19 Nov 2020
- 1
- 0