Video YouTube
618 views Published 5 Jan 2020 Open on YouTube 👍 Log in to like

Part 1 CrossCountry Crossing

Channel: werrington junction
Player
Description
A weekend of line possession on January 3rd to 6th 2019 to connect the Up Stamford line to the newly created deviation to allow the Werrington Junction dive-under work to begin in the wide area next to the ECML.
This video is before the 22:30 possession showing the new and old Stamford lines in use before the Up Stamford line is joined to its new alignment.
AI summary Generated from Fishplate metadata

This video shows railway activity at Werrington Junction and Stamford prior to a line possession event in early 2019. It captures the existing and new alignment of the Up Stamford line before it was connected to a newly created deviation, part of work to enable the Werrington Junction dive-under project near the East Coast Main Line. The footage includes trains operated by Cross Country, Freightliner, and GBRF, with several locomotives identified but no headcodes provided.

This summary is generated from structured Fishplate data and may need human review.
Unlock the full video breakdown

Fishplate has identified 5 locomotives in this video. We’ve also matched 3 operators . Create a free account to see where they appear, unlock timestamps and locations, and view the full breakdown.

History
Details
  • Platform ID OlpaVb3frlo
  • Views 618
  • Date published 5 Jan 2020 00:30
  • Date added 5 Jul 2026 04:16
  • Recorded 6 Jan 2020
  • Locomotives 5
  • Headcodes 0
Quick links
Log in to open the linked headcodes, operators, and vehicles detected for this video.
Location
Log in to view filming locations, route context, and the map for this video.
Recording date
Log in to view and help verify the recording date for this upload.
Thumbnails YouTube
Tip: right-click the player for stats, or open on YouTube for comments.