Werrington Junction Upgrade 6th October 2020
Network Rail Werrington Grade Separation
https://www.networkrail.co.uk/running-the-railway/our-routes/east-coast/east-coast-upgrade/werrington-grade-separation/
LumenRT Real Time WGS animation
https://www.youtube.com/watch?v=Jdv-H-ahGLc&t=7s
Werrington Grade Separation animation
https://www.youtube.com/watch?v=15IsBt7In0U&feature=youtu.be
articles, photos, plans and more.
https://drive.google.com/drive/folders/1-A1162n04x6xDXVyuQbf-am4O8ps52qy?usp=sharing
#werrington #peterborough
This video shows progress on the Werrington Junction upgrade project, focusing on work at Cock Lane. The Up Stamford track bed is under development, with ongoing excavation of a ramp leading to a dive-under structure and installation of steel girders. Holes are being drilled in sheet piles along a sloped line towards the dive-under, though their purpose remains unclear. The footage also captures an innovative method for managing surface water. Network Rail is overseeing the Werrington Grade Separation project, with additional information available through linked resources.
Fishplate has identified 0 locomotives in this video. We’ve also matched 1 operator . Create a free account to see where they appear, unlock timestamps and locations, and view the full breakdown.
- mS4nHkR_nnI
- 929
- 6 Oct 2020 19:14
- 5 Jul 2026 08:33
- 6 Oct 2020
- 0
- 0