Charing Cross - Exclusive access to the track during a major rail renewal project
Yet that is exactly what Network Rail and South Eastern are doing in a major, 22 day blockade to replace track and rebuild platforms between Waterloo East and Charing Cross.
And best of all, Green Signals was invited to go and walk the track to the works up close!
Subscribe: If you liked this video, please give it a thumbs up. Better still, hit that subscribe button. It supports the channel and means you'll be notified whenever we publish something new.
Membership: If you want to see even more from Green Signals, including exclusive content, become a member and support the channel further too.
YouTube - https://www.youtube.com/@GreenSignals/join
Patreon - https://www.patreon.com/GreenSignals
Green Signals:
Website - http://www.greensignals.org
Shop - http://greensignals.etsy.com
Newsletter - http://www.greensignals.org/#mailing-list
Follow:
X (Twitter) - https://twitter.com/greensignallers
LinkedIn - https://www.linkedin.com/company/green-signals-productions-ltd
Instagram - https://instagram.com/greensignallers
Credits:
Presenters - Nigel Harris (@railnigel on X) & Richard Bowker CBE (@SRichardBowker). General Manager: Stef Foster (@stefatrail)
Important Notes:
The views and opinions expressed by any guests or interviewees on this channel / podcast are strictly their own and should not be assumed to reflect those of the hosts, the management or the Directors of Green Signals Productions Limited.
The Green Signals podcast should not be considered professional advice, and listeners should consult appropriate and qualified professionals for advice tailored to their specific needs.
The Green Signals podcast and YouTube channel is provided ‘as is’ and the information provided on the podcast may not be accurate or complete. None of Green Signals Productions Limited, its Directors, hosts or management are liable for any claims or damages in any form arising from the use of or reliance on any statement, advertisement, product, service mentioned or any discussion about any matter.
None of Green Signals Productions Limited, its Directors, its hosts or its management are responsible for or any liability in respect of any third party advertiser content, claims or representations. The views, opinions or claims of any advertiser or commercial third party that may from time to time appear on, or be referenced by us, in any of our podcast shows or videos should not be taken to reflect our own views or opinions in any way.
All copyright in the original content created by Green Signals Productions Limited and published on the podcast and the YouTube channel is owned by Green Signals Productions Limited and must not be used or reproduced without written consent.
You can check our Privacy Policy here - https://www.greensignals.org/privacy-policy/
This video provides an exclusive look at a major rail renewal project taking place in central London, focusing on track replacement and platform rebuilding between Waterloo East and Charing Cross. The work is being carried out by Network Rail and Southeastern as part of a 22-day blockade. Freightliner, Loram, and other operators are involved in the operation. The footage includes access to the track and highlights the challenges of conducting such large-scale infrastructure work in one of the busiest railway areas in the world.
Fishplate has identified 2 locomotives in this video. We’ve also matched 5 operators . Create a free account to see where they appear, unlock timestamps and locations, and view the full breakdown.
- XP2C71fVRls
- 6,346
- 11 Aug 2026 16:32
- 14 Aug 2026 16:49
- 2
- 0