Video YouTube
100 views Published 23 Oct 2026 Open on YouTube 👍 Log in to like

The Barrington Branch 2026

Channel: stephensrailways
Player
Description
We take a detailed look at the Barrington branch, which is currently very busy with train loads of spoil being brought in from HS2 tunnel excavations. The quarry for the former cement works is gradually being filled in with up to two train loads per day. We take a look at some of these workings, which are being run by GBRf. Dates and details are provided in the video.
Unlock the full video breakdown

Fishplate has identified 2 locomotives in this video. We’ve also matched 2 headcodes and 2 operators . Create a free account to see where they appear, unlock timestamps and locations, and view the full breakdown.

History
Details
  • Platform ID 3r7KQ-ybYok
  • Views 100
  • Date published 23 Oct 2026 07:20
  • Date added 24 Oct 2026 04:02
  • Recorded 21 Oct 2026
  • Locomotives 2
  • Headcodes 2
Quick links
Log in to open the linked headcodes, operators, and vehicles detected for this video.
Location
Log in to view filming locations, route context, and the map for this video.
Recording date
Log in to view and help verify the recording date for this upload.
Thumbnails YouTube
Tip: right-click the player for stats, or open on YouTube for comments.